Plastic machinery maintenance
Plastic machinery in the movement, the plastic machinery should be maintained, and this maintenance and maintenance should also be operated according to certain regulations, which is conducive to the operation of mechanical equipment, while maintaining the relevant equipment safety technical performance requirements, can be effective The guarantee of equipment and personnel safety.
Pre-installation inspection
The equipment is also composed of various components. Before installation, check the individual equipment components, check the main steel structure, bearings, bolts, etc., and at the same time, whether the surface condition of the parts is anti-corrosion, etc., make a record to Prepare for future inspection.
maintenance
When the equipment is in normal operation, it should be carried out in accordance with the rules and regulations and daily and regular maintenance. The daily maintenance is mainly responsible for cleaning, fastening, lubrication, adjustment and anti-corrosion. This is checked every day, and regular maintenance, The maintenance and repair of mechanical equipment is carried out several times during the specified time, with cleaning, lubrication, adjustment, disassembly and overhaul as the central content.
Overhaul request
The overhaul of the equipment means that the damage of the equipment is very serious or the damage is very serious, and the mechanical performance is significantly reduced. At this time, the overhaul is performed, such as the mechanical performance of the machine is significantly reduced, the fuel consumption is increased, the operation is not working, and the sound is sounded. Under the condition that the abnormality or the equipment can not play the normal production performance, a thorough recovery repair method is adopted. At this time, the overhaul should be carried out according to the regulations, and the progress of the work should be arranged at the same time.
Equipment scrap
In the process of overhaul, there will be the possibility of scrapping, and the maintenance professional will be responsible for the implementation. There must be records and acceptance. For equipment that exceeds and is close to the end of life, a certificate of overhaul acceptance should be provided before installation, and a record of scrapping should be made at the same time.
Previous:Precautions when using a high blown film machine | next:Plastic extruder barrel wear maintenance method and precautions |